Case Study: UNIVERSITY OF TASMANIA
Fume Cupboards
Masters Contracting has had a long association with the University of Tasmania, particularly with their laboratory fume cupboards.
Our company has performed upgrade contracts to bring all the Tasmanian University facilities' fume cupboards (approximately 200 units) up to the current requirements of AS2243.8:2001.
Plumbing
Masters Contracting, with its multi skilled work force undertook a major hydraulic services contract at the University of Tasmania Geology Codes building. Work consisted of the installation of sub-drainage systems, stack risers interconnecting to various waste systems of a multi-storey teaching and research laboratory.
These complex systems included Micro Science Clean Room waste system, fume cupboard scrubbers, neutralising tanks, toilet and hand basin drainage systems, domestic hot and cold water, fire hydrants and hose reel systems.
Reduced Pressure - Zone Device (RPZD) backflow prevention devices were installed and tested to protect the building potable water supply system.